# Managing a Software Project from the Client Side

> The supplier is responsible for the software existing. Whether it turns out useful is the client's responsibility — and that is where most failed projects fail.

Published: 2026-11-23

- The most common cause of slippage is not development but waiting for a decision or for material from the client's own company.
- A project needs one person on the client side with authority to decide, not a committee that meets every three weeks.
- Testing is not the same as handover; if it starts at the end, the bugs found can no longer be fixed.
- Changing the brief is not a problem — the problem is changing it without deciding what drops out in exchange.

The supplier delivers exactly what was specified, on the agreed date. Six months later, nobody in the company is using the system.

That is what most failed software projects look like. They did not fail on the code — they failed on what the client was supposed to provide.

## One person with authority

This is the most important precondition and the one most often missing. A project needs **one person on the client side who is allowed to decide** — not a committee that meets every three weeks, and not "management will have to approve that" for every question.

They do not need to understand the technology. They need to understand the process, know the company, and have the mandate to say "this is how it will be".

Without such a person, the project does not stop — it drags. Every question adds a week, every decision gets revisited later, and the deadline moves by months with no single visible cause.

## Slippage comes from waiting, not from development

Look back at a typical project and a surprising share of the time is not programming. It is waiting: for material, for access to systems, for an accountant's answer, for somebody to come back from leave.

So it is worth writing down before the start **what the supplier will need and from whom** — and telling those people it is coming. Otherwise a request for an ERP export lands at the bottom of the task list of somebody who has never heard of the project.

This connects to what we describe in [preparing a brief for a software project](/blog/ako-pripravit-zadanie-pre-softverovy-projekt-brief-ktory-funguje).

## The people who do the work

The best source of information is not the head of department but the person who runs that process every day. They know where the exceptions are that the policy does not mention, and what is actually done differently.

The difficulty is that these people have their own jobs, and taking part in the project is extra load. If that is not budgeted into their capacity, the supplier gets its information from somebody who remembers it approximately.

## Decisions have their moment

During development, questions come up that the brief does not answer — what happens with a cancellation after dispatch, how rounding works on a split, what a deputy sees during an absence.

Those questions are a sign the project is being done properly. What matters is that they have **a short path to an answer**. A rule that works: a supplier's question gets an answer within 48 hours, even if the answer is "we will decide on Friday".

## Testing is not handover

The most expensive project-management mistake on the client side is leaving testing until the end. Bugs found a week before launch do not get fixed — either you launch with them or you move the date.

What works: **try it as you go**, in pieces, with real data and with the people who will actually use the system. Not to find bugs in the code — the supplier has its own tests for that — but to discover in time that the process really runs differently from how everyone assumed.

And feedback belongs in one place, not spread across emails, chat messages and meeting notes. Otherwise half of it is lost and the other half arrives twice.

## Changing the brief is not a problem

Changes during a project are normal — the company keeps developing in the meantime. The problem arises when things get added without deciding what drops out in exchange, or how far the date moves.

So every change should answer three questions: **what it gains, what it costs, and what will not be done because of it.** If the third goes unanswered, the project inflates and nobody will know why.

## Operation is prepared during the project

Launch is not the end. Before it, it should be clear who will administer the system, who will train people, how problems get reported and what happens to the previous solution.

That part is covered in [handing over a software project](/blog/odovzdanie-softveroveho-projektu-dokumentacia-pristupy-a-znalosti) — and it is exactly the part that decides whether the system is still in use a year later.

## Where to start

Before signing, not after: name one decision-maker, write down who in the company the project will need and how much time it will take them, and agree how quickly questions get answered. Three things on one page, with more influence on the outcome than the choice of technology.

If you are planning a project and want to go through what will be needed on your side, [get in touch](/kontakt). More on [custom development](/riesenia/vyvoj) and examples in our [case studies](/referencie).


---